East Bridgewater Board of Health Approves Three Septic Permits, $24,650 Landfill Invoice

EAST BRIDGEWATER — February 2, 2026 — East Bridgewater Board of Health approves three septic construction permits and clears more than $25,000 in invoices at February 2 meeting. Vice Chair Rob Lyons presided with Clerk Thomas Duquette, Jr. after Chair Andrew Hudson was absent due to illness. The board unanimously approved two local upgrade variances from Collins Engineering — one at 713 Bridge Street allowing a foundation setback reduction from 20 to 10 feet and a groundwater separation reduction from 12 to 2 inches using a biokinetic treatment system, and one at 1126 Plymouth Street reducing the required groundwater-to-soil-absorption-system separation from five feet to two feet via an Elgin alternative system for owner United Development 809 LLC. A third standard Title V permit was approved for 204 Thatcher Street with no variances. The board's largest invoice, $24,650 to Brown and Caldwell for Bridge Street Landfill monitoring, was approved without discussion. Health Agent Mike Soares also briefed the board on Facebook-driven concern about septic odors near the Mary Lou gas station, reporting he had investigated that afternoon, detected no odor, and will monitor the area daily while holding a repair plan ready for a nearby property already identified as being in potential failure.

Keep reading with a 14-day free trial

Subscribe to Plymouth County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Plymouth County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe