Marshfield Conservation Commission closes hearings on ADU, Water Street projects
Conservation · Meeting of March 4, 2026
Marshfield Conservation Commission unanimously approves ADU project near North River wetlands, issues two orders of conditions. The commission closed public hearings Wednesday on a proposed 36-by-24-foot accessory dwelling unit at 180 Sawyer's Lane and a separate landscaping project at 13 Water Street, both brought by engineer Rick Cervant of Senbeck and Taylor. Conservation Administrator Mike Steele recommended a dual erosion control barrier — a staked silt sock over a toed-in siltation fence — for the sloped rear yard at Sawyer's Lane, where the structure sits just over 90 feet from a bordering vegetated wetland draining to the North River Basin.
The commission added a condition requiring all ADU roof drainage to be routed to a subsurface dry well after abutter Colin West, of 190 Sawyer's Lane, raised concerns about an existing erosion hole that has grown larger over the years on his down-gradient lot. The board also extended the Christmas Cove subdivision permit on Highland Street by three years under the Massachusetts LEADS Act and retained a 30-day herbicide notification requirement before any Sonar treatments at Fairways Edge Pond.
In the full story:
- The complete report — 1,053 words
Source: the Conservation meeting of March 4, 2026, reported from the official video recording and transcript.
Keep reading with a 14-day free trial
Subscribe to Plymouth County News to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news